UNIVERGE SV8100
System Hardware Manual
Figure 5-59 Ribbon Cable Installed
9.
Align the projections on the bottom of the 8LKD
(LD)-L UNIT into the guide holes on top of the
multiline terminal.
10.
Slide the 8LKD (LD)-L UNIT toward the keypad
buttons until snug (refer to
UNIT
Installed).
Figure 5-60 8LKD (LD)-L UNIT Installed
Guide
Projection
Guide
(One Each Side)
Figure 5-60 8LKD (LD)-L
Issue 5.0
5 - 55