Figure 6: Surge Ground / Chassis Ground Connection
NOTE
• Equipment must be installed according to the applicable country wiring codes.
• All line-to-ground transient energy is shunted to the Surge Ground terminal. In cases where users
require the inputs to be isolated from ground, remove the ground braid between Surge and Chassis
Ground. All line-to-ground transient protection circuitry will be disabled.