Connecting The Analyzer To Vistanet; Initial Setup - ABB PGC2000 Operation And Service Manual

Process gas chromatograph
Table of Contents

Advertisement

2. On the Commands screen cursor to ANALYSIS CONTROL, if necessary, and then press the F4
(Start/Stop Analysis) soft key.
3. On the Start/Stop Analysis screen, verify that the highlighted area is on "At End of Analysis?" and
press the F2 (Stop Analyzer) soft key. The analyzer will stop at the end of the analysis.
4. Press the F1 soft key as necessary to return to the Background screen.

CONNECTING THE ANALYZER TO VISTANET

If the analyzer is connected to ABB's VistaNET, you must connect the GCC to the VistaNET PC as
described in the VistaNET 2.0 Installation Guide (2300-IG). After the connections have been
completed and verified you must set up the GCC to work on this network. This setup consists of
several sets of front panel display entries.

Initial Setup

These steps set up the analyzer to work with VistaNET. The paragraphs that follow explain specific
additional information required for full VistaNET operation.
Before changing VistaNET screens, verify all data with your Network Administrator
to ensure proper VistaNET connection and operation.
1. On the Background screen press the F1 (Exit to Commands) soft key.
2. On the Commands screen, cursor to TESTING/SETUP and then press the F4 (Status Display)
soft key.
3. On the Controller Status screen, press the F2 (Clear Highway Stats) soft key to reset all data to
zero so you will know when VistaNET data is sent and received.
4. On the Commands screen, cursor to VISTANET and then press the F2 (VistaNET Tables and
Commands) soft key.
2-32
NOTE
2000-OSM, F1

Advertisement

Table of Contents
loading

Table of Contents