GE iBox Installation And Maintenance Manual page 32

Grid solutions
Table of Contents

Advertisement

iBox/iBox Kit
Installation and Maintenance Guide
System Diagnostics
System
Once power is applied, the iBox automatically boots and conducts a series of self-
Diagnostics
diagnostic tests. If the iBox fails to boot up properly (which indicates that a self-
diagnostic failure has occurred), it might have sustained internal damage during
shipping. Contact GE Digital Energy for assistance.
LEDs
The POWER and RUN LEDs will both light during the self-diagnostic sequence.
Diagnostics
Self-diagnostics have completed successfully when the POWER and RUN LEDs are
Completed
on solid.
32
994-0047-5.10-4
GE Grid Solutions
GE Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibox kit

Table of Contents