6.5 Checking the RHUB Hardware Installation

After an RHUB is installed, check the installation of hardware including the devices and
related cables.
Table 6-6
Table 6-6 Hardware installation checking list
No.
1
2
3
Table 6-7
Issue 06 (2015-10-30)
Route the cable, and then use a cable tie to bind the cable. For details, see
Requirements for Cable
Label the installed cable. For details, see section
lists the hardware installation checking items.
Item
The position for each device conforms to the engineering design and meets the
space requirement.
Ensure that the RHUB is properly installed.
The surface of the RHUB is neat and clean. The external paint is intact. The
labels, tags, and nameplates are correct, legible, and complete.
lists the checking list of the power cable and PGND cable connections.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Layout.
11.3 Attaching an L-Shaped
6 Installing an RHUB
6.4.1
Label.
46

Advertisement

Table of Contents
loading

Table of Contents