Installing A Prru3901 On A Plate - Huawei DBS3900 Installation Manual

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
Step 3 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and
then press the pRRU3901 downwards until a click is heard. See
Figure 7-16 Installing a pRRU3901 on a pole
----End

7.4.5 Installing a pRRU3901 on a Plate

This section describes how to install a pRRU3901 on a plate. If a suspended ceiling plate has
adequate load bearing capacity and installation space, the pRRU3901 can be installed on the
plate. However, it is good practice not to install a pRRU3901 on an aluminum plate.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and
the clearance requirements.
Step 2 Place the mounting bracket in the installation position against the wall. Then, level the
mounting bracket and use a marker to mark two anchor points. See
Issue 06 (2015-10-30)
NOTE
It is good practice to perform the installation from the side view to promptly align the hooks with the
mounting holes.
NOTE
For details about the clearance requirements, see
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
7.1.3 Space
Requirements.
Figure
7 Installing a pRRU3901
7-16.
7-17.
68