Checking The Prru3901 Hardware Installation - Huawei DBS3900 Installation Manual

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
Figure 7-31 Installing jumpers between the pRRU3901 and external antennas
----End
Follow-up Procedure
1.
2.

7.6 Checking the pRRU3901 Hardware Installation

pRRU3901 hardware installation checking includes hardware and cable installation checking.
Table 7-8
Table 7-8 Hardware installation checking list
No.
1
2
3
4
Table 7-9
Issue 06 (2015-10-30)
Route the cable, and then use a cable tie to bind the cable. For details, see
Requirements for Cable
Label the installed cable. For details, see section
lists the hardware installation checking items.
Item
Ensure that the pRRU3901 is not grouned.
The position for each device conforms to the engineering design and meets the
space requirement.
Ensure that the pRRU3901 is properly installed.
The surface of the pRRU3901 is neat and clean. The external paint is intact.
The labels, tags, and nameplates are correct, legible, and complete.
lists the check items of the signal cable connection.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Layout.
11.3 Attaching an L-Shaped
7 Installing a pRRU3901
7.5.1
Label.
85

Advertisement

Table of Contents
loading

Table of Contents