Step 3 Cut the PGND cable to a length suitable for the actual cable route.
Step 4 Add an OT terminal to each end of the cable according to the instructions in Assembling the OT
Terminal and the Power Cable.
Step 5 Connect the OT terminal (M6) at one end of the PGND cable to the DC/DC power system and
the OT terminal (M6) at other end to the IFS06, as shown in