Huawei DBS3900 Installation Manual page 71

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Component
Model III
Procedure
Step 1 Place the marking-off template on the ESD floor. Then use a marker to mark four anchor points,
as shown in
Figure 8-7 Marking anchor points
(1) Wall
Step 2 Drill holes on the ESD floor, as shown in
the ESD floor.
Issue 12 (2015-04-30)
Applicable Height
410 (16.14 in.) ≤ H ≤ 700 (27.56
in.)
NOTE
The height of an ESD floor is the spacing between the concrete floor and the upper surface of the ESD
floor.
Figure
8-7.
NOTE
Use a vacuum cleaner to clear the dust out from inside and around all the holes, and measure the distances
between holes. If any hole does not meet the requirements, mark new anchor points and drill new holes.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Front
Figure
8-8. Ensure that the hammer drill penetrates
8 Installing the IFS06
Remark
ESD floor is 410 mm (16.14 in.),
model II is preferentially
selected.
(3) Left
66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents