Huawei DBS3900 Installation Manual page 103

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Figure 13-10 Installing the PGND cable for the AC/DC power system
(1) OT terminal (M6)
Step 5 Lay out the cable according to the instructions in
ties to bind the cable.
Step 6 Label the installed cable according to the instructions in Attaching a Cable-Tying Label.
----End
Issue 12 (2015-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Installing Components in the IMB03
15.1 Cabling
Requirements, and use cable
98

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents