ABB 650 series Engineering Manual page 125

Hide thumbs Also See for 650 series:
Table of Contents

Advertisement

1MRK 511 261-UEN -
650 series
Engineering Manual
is derived from International Atomic Time (TAI) by the
addition of a whole number of "leap seconds" to synchronize
it with Universal Time 1 (UT1), thus allowing for the
eccentricity of the Earth's orbit, the rotational axis tilt (23.5
degrees), but still showing the Earth's irregular rotation, on
which UT1 is based. The Coordinated Universal Time is
expressed using a 24-hour clock, and uses the Gregorian
calendar. It is used for aeroplane and ship navigation, where
it is also sometimes known by the military name, "Zulu
time." "Zulu" in the phonetic alphabet stands for "Z", which
stands for longitude zero.
UV
Undervoltage
WEI
Weak end infeed logic
VT
Voltage transformer
X.21
A digital signalling interface primarily used for telecom
equipment
3I
Three times zero-sequence current. Often referred to as the
O
residual or the earth-fault current
3U
Three times the zero sequence voltage. Often referred to as
O
the residual voltage or the neutral point voltage
Section 10
Glossary
119

Advertisement

Table of Contents
loading

Table of Contents