Basic hardware procedures
In addition, at least two people are needed when server enclosure is
installed in the height of 25U or more.
(for Japan, please refer to " 安全上のご注意 ".)
Additionally, a lifter is required in the following cases:
– The server weighs more than 50 kg.
– The server weighs more than 21 kg and is installed above the height
of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
44
For configurations below 32 kg:
At least two people are needed to lift the server
out of the rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server
out of the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server
out of the rack cabinet.