Siemens S5-155U System Manual page 427

Hide thumbs Also See for S5-155U:
Table of Contents

Advertisement

Configuring
Switching off the CC
Separate or common
shutdown of the CC/EU and
load power supply
System Manual
C79000-B8576-C109-03
You must observe the following when configuring systems:
Switching on At the latest 100 ms after power-up of the PLC, the
voltage must be present at the enable inputs of the I/O
modules.
Switching off When the PLC has been switched off, the voltage at
the enable inputs of the I/O modules must still be
present as long as the internal 5 V voltage is present.
You should observe the following instructions for switching off CCs
and equipment for supplying power to the enable inputs.
When there is a need to switch off the load power supply separately
without affecting the enabling of modules, there are the following
possibilities for producing the enable voltage. These exist even when
the load power supply is used without an additional capacitor and
common shutdown.
• • 230 V AC supply for CC/EU and load power supply
a)
-951
Power Supply
230 V AC
Load Power Supply
Supply for the enable inputs from:
a) 6ES5 951-4LB11 load power supply
b) Battery
c) Terminals for 24 V on the front plate of the power supply
The 465 Analog Input Module
b)
I/O Modules
F +
CC/EU
L +
L +
24 V
Battery
c)
9
9 - 55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5-135uSimatic s5

Table of Contents