7360 ISAM FX-4 shelf cabling
5
6
7

18.12 Vectoring cable connector

This DLP provides the steps to connect vectoring links between a NDPS-B card and
NDLS-E cards.
18.12.1
The VL cables must not be routed where they may be exposed to high voltage such
as lightning strikes.
While no particular arrangement of VL cables between SLV LTs and VL ports on the
centralized vector processor card is required, it may be desirable to maintain a
particular connection arrangement of these cables.In those circumstances, both
ends of all cables may be labeled before installation so that each cable is uniquely
identified. Examples of such identification include operator-provided colored zip ties
and colored or write-on labels.
18.12.2
The following tools are required:
The following parts are required:
360
Secure the connector with standoffs and nuts.
Route and connect the other end of the MDF cable as per site practices.
STOP. This procedure is complete.
VL cable
When VL cables need to be disconnected, only do
Caution —
so by pulling the release ring tab. Do not pull on the cable itself
or on the QSFP+ modules pre-installed at each end.
Prerequisites
antistatic wrist strap
cable ties or lacing cord
QSFP+ 1m cable (3FE 68462 AA)
3HH-12893-AAAA-TCZZA
ANSI Hardware Installation Manual
DRAFT
Issue: 09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7360 isam fx-16

Table of Contents