Commissioning A Device; Instructions For Commissioning; Switching The Device On/Off - Siemens SENTRON 7KN POWERCENTER 3000 Manual

Iot data platforms
Hide thumbs Also See for SENTRON 7KN POWERCENTER 3000:
Table of Contents

Advertisement

4.5

Commissioning a device

4.5.1

Instructions for commissioning

Danger of burns
The surface of some devices can reach a temperature of over 70 °C. These devices are
marked with labels indicating this.
• Touching without protection can result in burns.
• Avoid touching directly during operation.
• Only ever touch the device with suitable protective gloves.
Requirements
● The PE conductor has been connected.
● The device is connected to the power supply.
● The connecting cables are plugged in correctly.
4.5.2

Switching the device on/off

Procedure - switching the device on
The device starts as soon as 24 V are applied.
Note
The LED "PC ON/WD" lights up green.
You will find more information on the LEDs in chapter Status indicators of the devices
(Page 15).
7KN POWERCENTER 3000
Manual, 10/2019, L1V30579222003-01
CAUTION
Installing, connecting, commissioning
4.5 Commissioning a device
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents