Connecting The Optional Ground; Connecting The Power Cable; Confirming Correct Installation - Motorola OM 1000 Installation And Operation Manual

Out-of-band modulator
Table of Contents

Advertisement

Connecting the Optional Ground

Connect a ground wire from the OM 1000 to the rack frame using a #10-32 screw.

Connecting the Power Cable

Use only an AC-power cord that complies with the country's product safety requirements.
CAUTION!
To prevent electrical shock, do not use the polarized power cord with an extension cord, receptacle, or other outlet
unless all blades can be fully inserted to prevent blade exposure.
Connect the AC-power cord after all I/O connections are complete. The power supply
automatically senses and adapts to any input from 85 through 264 Vac, at 47 through 63 Hz.
The OM 1000 meets all specifications with an AC input from 100 through 240 Vac, 50 through
60 Hz.

Confirming Correct Installation

After applying power to the OM 1000, there is short initialization period. If the installation is
correct, verify:
The green
indicator is on and the LCD displays the MAIN menu.
POWER
The
,
PLL ERROR
RF ERROR
modulator is not set up in the INTFC menu and enabled in the PORT menu.
When the above sequence is observed, the unit can be configured. Refer to Section 4, "Setup and
Operation" for information on preparing the unit for operation. If the above conditions do not
occur, refer to Section 5, "Troubleshooting."
, and
LEDs may illuminate red to indicate the RF
FAULT SUMM
Installation
OM 1000 Installation and Operation Manual
3-5

Advertisement

Table of Contents
loading

Table of Contents