Connection To Electricity Supply - Siemens SIPROCESS GA700 Operating Instructions Manual

Continuous gas analysis, wall-mounted device
Hide thumbs Also See for SIPROCESS GA700:
Table of Contents

Advertisement

Connecting

7.2 Connection to electricity supply

7.2
Connection to electricity supply
Procedure
Note
Terminal ranges of the cable glands
Use cables matched to the terminal ranges of the cable glands:
• Cable gland M16 x 1.5 (plastic): Terminal range 5 to 10 mm
• Cable gland M16 x 1.5 (metal): Terminal range 6 to 10 mm
• Cable gland M20 x 1.5 (plastic/metal): Terminal range 10 to 14 mm
For more information, refer to: .Replacing the cable gland set (Page 67).
1. Open the door of the wall-mounted device by unscrewing the six screws in the door.
2. Remove the EMC plate on the right side panel.
3. Unscrew the union nut of the cable gland
4. Insert the connecting cable through the cable gland
5. Press the wire end ferrules (VDE 0100 Part 520) onto the ends of the wires. Now connect
Note
Tightening the screws
Tighten the screws to the appliance plug with a torque of
• 0.5 Nm at the terminals,
• 0.3 Nm at the strain relief and the connector housing.
6. Connect the appliance plug
7. Fasten the connecting cable in the cable gland
40
the wires of the connecting cable to the appliance plug
and PE conductor connections are correct!
torque of 3 Nm.
.
to the power supply unit
. To do this, tighten the union nut to a
Operating Instructions, 01/2013, A5E31930403-01
.
. Ensure that the power supply
.
Wall-mounted device

Advertisement

Table of Contents
loading

Table of Contents