PowerCube 5000
User Manual (SmartLi 100Ah)
Figure 3-20 Installing power cables for the ESMs
Step 7 Reinstall the terminal cover on the ESMs.
----End
3.5.4 Installing an IP21 Component
Procedure
Step 1 Install leveling feet for the IP21 component, with two long feet at the front and two short feet
at the rear.
Issue 02 (2020-03-17)
The silkscreens "front" and "back" are displayed on the surface of the IP21 component. Note the
directions during installation.
Select the mounting holes for leveling feet based on the cabinet width onsite.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
72