Starting up
Installing the server enclosure into the rack
V
CAUTION!
At least two people are needed to position the server on the rack rails.
(For Japan, see " 安全上のご注意 ".)
V
Additionally, a lifter is required in the following cases:
– The server enclosure weighs more than 50 kg.
– The server enclosure weighs more than 21 kg and is installed above
the height of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
54
For configurations below 32 kg:
At least two people are needed to lift the server
enclosure out of the rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server
enclosure out of the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server
enclosure out of the rack cabinet.