Fujitsu PRIMERGY CX400 M4 Operating Manual page 58

Server enclosure
Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Starting up
– The server enclosure weighs more than 21 kg and is installed above
the height of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
Figure 24: Removing the server enclosure out of the rack (A)
Ê While pressing the locking levers (1) on both sides of the enclosure use the
brackets (2) to pull the server enclosure out of its lock.
58
Operating Manual
CX400 M4

Advertisement

Table of Contents
loading

Table of Contents