Siemens ACUSON S2000 Installation Instructions Manual page 16

Hide thumbs Also See for ACUSON S2000:
Table of Contents

Advertisement

16
b) Verify the Power Button illuminates green. Reference
c) The control panel turns on, then off, indicating the completion of the power-on self
test (POST).
d) The I/O panel:
LEDs 1,3, 4, 5, 6, 7, 8, and 9 - illuminate green.
LED 2 - illuminates yellow.
Fig. 9:
6. Verify system completes the boot sequence to imaging without displaying any error
messages.
ACUSON S2000
IO Panel -- LED Lights
NOTE
The boot sequence completes in approximately three to five
minutes.
US15-101.812.01.02.02
05.10
System Delivery Procedure
(Fig. 8 / p.
Page 16 of 40
Ultrasound
15).
Siemens

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents