14
Lamp
LINK/ACT
LINK/ACT
LAN port
Hardware Installation
Refer to the Express5800 Server User's Guide for hardware installation.
If you have a low-profile computer cabinet, replace the original full-height bracket with the low-profile bracket
supplied in the product package.
Please attach this adapter with reference to User's Guide of
IMPORTANT:
Express Server.
Bracket Replacement
1. Remove screws (2pieces) ,and remove full-height bracket from the board.
2. Attach the low-profile bracket to the board.
3. With screws, fix the bracket to the board.
Full-height Bracket
(Original)
Screw
Lamp
Status
Meaning
LINK/ACT
Green
Link Established
Amber
Data being transmitted /received
Red
Unload device driver
Off
Link not established
If DC power of the server is OFF, Lamp does not light. (OFF)
Replacement
Board
Low-Profile Bracket