Download Print this page

Huawei OptiX RTN 320F Quick Installation Manual page 11

Radio transmission system v100

Advertisement

Installing the OAU 2F
4
Installation at a 4+0 or 3+0 Site
Installation procedure
Integrated installation
1
Install a ground cables of the OAU 2F and
XMC ODU .
Install the device-side ground cable before
you climb up the tower.
2
Install the XMC ODU on the OAU 2F.
 Install the joining kit on the XMC ODU.
 Install the XMC ODU on the OAU 2F.
3
Install the joining modules of the XMC ODU and
OAU 2F on the antenna.
 When the XMC-3/3H ODU is used, first install the
joining modules of the XMC ODU and OAU 2F on
the hybrid coupler together with the other XMC
ODU, and then install the coupler on the antenna.
 When the XMC-5D ODU is used, install the
joining modules of the XMC ODU and OAU 2F on
the dual coupler, and the install the dual coupler
on the antenna.
In the example integrated installation, the XMC-5D
ODU is used.
4
Install an IF cable. Connect the IF ports of the OAU 2F and XMC ODU using an IF cable.
For the method of making and laying out an IF cable, see the RTN XMC ODU Quick Installation
Guide.
Do not remove or insert an IF cable connector from or to the OAU 2F with power on. Otherwise,
human injuries may be caused.
Install an outdoor fiber or network cable.
5
 Connect an outdoor fiber or network cable to a port.
 Lay out the outdoor fiber or network cable.
 Attach a yellow label to the fiber or network cable, and write a number on the label
according to the plan.
6
Install a DC power cable.
 Connect a DC power cable to the DC power port in the maintenance compartment.
 Lay out the DC power cable.
 Select ground points for the DC power cable, and install ground clips.
 Attach a matte white label to the DC power cable.
7
Waterproof DC power cable, ground clips, and IF cable connectors.
Split installation
1
Install the OAU 2F on a pole or wall.
Install the XMC ODU on the antenna.
2
For details about how to install the
XMC ODU, see RTN XMC ODU
Quick Installation Guide.
3
Install a ground cable of the OAU 2F.
Install the device-side ground cable
before you climb up the tower.
Connected to one 10GE
(optical) service
The GE1(e) or GE2(e) port can be used
to transmit/receive electrical services, and
the 10GE1(o) or 10GE2(o) port can be
used to transmit/receive optical services.
In this example, the 10GE1(o) port is
used.
For the method of installing an antenna,
follow the antenna installation guide
delivered with the antenna.
IF1
7
2
4
IF2
1
Side strut
10GE1(o)
3
5
6
Grounded through
the ground clip
Connected to a
power supply
device
DC
power
cable
Connect to a
DC
ground bar
power
cable
7
10
Commissioning procedure
Power on the OAU 2F.
1
2
Use the Web LCT to configure NE data.
3
Align antennas.
Check the installation.
4
When the XMC-5D ODU is installed on a dual coupler and is
used with the OAU 2F, a side strut must be installed for
antennas with a diameter of 1.2 m or more to facilitate better
load bearing.

Advertisement

loading