Commissioning a drive
3. Click on button "Safety notes".
4. Read and take note of the safety notes and then close the window.
5. In the "Assume control priority" window, click on button "Accept".
40
The "Assume control priority" window opens.
Figure 7-5
Assuming control priority
The "Safety notes" window opens.
Figure 7-6
Safety instructions
The window is closed and the control panel is activated.
Figure 7-7
Control panel motor enable signal
Getting Started, 01/2013, 6SL3097-4AG00-0BP2