Setup the Power Measuring Unit
STEP2
11
Connection method for power and CT with solar 
generation and storage battery systems.
Once connect, 
tap the "Next" button.
12
Checking the connection of the 
Power Measuring Unit to the Gateway.
IMPORTANT
(1) Remove the cover and pass the CT Cable and connect it to the CT connector on the 
Power Measuring Unit labelled "PV" for measurement of a solar generation system 
or the connector labelled "SB" for measurement of a storage battery system.
(2) Check the phase of the breaker connected to the solar generation or storage 
battery system being measured, and connect and install the CT to I1, I2 and I3 on 
the CT Cable so that they connect to V1, V2 and V3 on the power wire.
* To attach multiple solar PV or storage battery systems, the position of the clamp 
Note
should be where the  systems share a wire. If such a connection site is not 
available, only a single system can be measured. Additionally, measurement will 
not be possible if the rating is exceeded (63A).
* When adding a cable for a solar generation or storage battery system to an 
existing system, ensure that the main breaker or dedicated power connection 
breaker is "OFF" prior to commencing work.
1. Are the phases on the power terminal connection wires correct? 
2. Are power terminal wires on the correct position and fully inserted?
3. Is the CT installation position and direction correct? 
4. Is the CT Cable installed in the correct location? 
5. Turn the dedicated power connection breaker and main breaker on, 
and check the Power Measuring Unit power LED lights up.
Once checks are complete, tap the "Next" button. 
18
A CT Cable set (MKG1510-DE), available separately, 
is required for connection.