Front Board Assembly (FB) Diagnostic Tests

The FB diagnostics tests check the FB circuits and boards. To avoid frequent rebooting of the system,
these tests must be performed in the sequence described below. When performing FB tests out of
sequence, follow the instructions displayed in the Comment area of the FE Diagnostics dialog box, and
reboot as required. Refer to
the FB circuits and boards.
Note:
Before performing the FB tests, make sure that the RFI (or IMP, VME Bus, RFT, FEC) and
BF diagnostic tests have been performed, as described beginning on page 7-11.
If the FB tests are performed without first performing these tests, and errors are identified, you must
perform the following tests (in the order listed) to ensure that the FB is in fact the source of the error:
For Systems with RFI Configuration:
- MUX Diagnostic Test
- Beamformer (BF) Diagnostic Test
- Radio Frequency Interface (RFI) Diagnostic Test
7-3-8-1

Accessing the Front Board Assembly Options

1) Access the FE Diagnostics dialog box, as described in the
Options
2) In the FE Diagnostics dialog box, trackball to the F.B. tab and press Select,
OR
Trackball to the F.B. button in the Data Flow Maps and press Select. The F.B. tab is displayed, as
shown in
7-26
3
EVISION
Chapter 5 - Components and Function (Theory)
section, on page 7-6.
Figure 7-14
on page 7-27 ( or
Section 7-3 - Performing Front End (FE) Diagnostics
For Systems with RFT Configuration:
- MUX Diagnostic Test
- Beamformer (BF) Diagnostic Test
- Front End Controller (FEC) Diagnostic Test
- RFT Diagnostic Test
- VME Bus Diagnostic Test
- Image Port (IMP) Diagnostic Test
Accessing the Front End Diagnostic
Figure 7-15
on page 7-28).
V
™ 4 S
M
IVID
ERVICE
ANUAL
for additional details about

Advertisement

Table of Contents
loading

Table of Contents