Installing The Gas Outlet Casing; Table 45 Tightening Torque (51009) - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8
Dismantling and fitting
8.19

Installing the gas outlet casing

Figure 54: Installing the gas outlet casing
Part number
51009
Table 45: Tightening torque (51009)
1. Insert a new gasket (61002) into the gas outlet casing (61001).
2. Coat the threads of the studs (51008) with high-temperature grease.
3. Attach the lifting gear to the gas outlet casing (61001) and position the gas outlet casing in
the correct position on the turbine casing (51000).
4. If present: Fit the support (61301).
5. Fit the hexagon nuts (51009). Observe the tightening torque.
© Copyright 2017 ABB. All rights reserved.
A130
A135
M8
M10
20 Nm
40 Nm
HZTL4031_EN
Page 103 / 121
A140
A145
M12
M12
65 Nm
65 Nm
Revision E
January 2017

Advertisement

Table of Contents
loading

Table of Contents