Table 14 Wet Cleaning Of Turbines, Pa - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
6
Periodic maintenance work
Figure 23: Carrying out wet cleaning of turbines
Fulfil prerequisites.
Ensure that the water supply (01) is guaranteed.
Open the stop valve (02) and set the water volume flow V
cleaning parameters).
Close the stop valve (02) after 10 minutes.
Wait for 10 minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB Turbocharg-
ing Service Station.
Product
Temperature before
turbine before clean-
ing [°C]
A130
350 ... 430
A135
350 ... 430
A140
350 ... 430
A145
350 ... 430
Table 14: Wet cleaning of turbines, parameters
Corresponds to a water pressure p
1)
© Copyright 2017 ABB. All rights reserved.
Maximum tempera-
ture before turbine
during cleaning [°C]
530
530
530
530
of 1.5 bar (overpressure compared to atmosphere)
WT
HZTL4031_EN
with a flowmeter (03) (see
W
Water volume flow
V
[dm
/min]
3
1)
W
4.0
5.5
8.5
12.0
Revision E
Page 53 / 121
Injection time
[min]
10
10
10
10
January 2017

Advertisement

Table of Contents
loading