Table 13: Turbine Wet Cleaning, Recommended Operating State - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
6
Periodic maintenance work
6.3.5
Prerequisites
Characteristic/component
Engine load (guideline value)
*) Turbine inlet temperature T
jection
Stabilisation phase after T
Stabilisation phase after turbine cleaning
Water supply
Water pressure (overpressure compared to at-
mosphere) p
WT
Water temperature

Table 13: Turbine wet cleaning, recommended operating state

*) The temperature at the turbine inlet can be up to 100 ℃ higher than the exhaust gas tem-
perature after the cylinder. This must be taken into account when setting the operating point
before cleaning.
If necessary, the engine performance must be reduced to meet these conditions.
The cleaning cycle can be started when the above conditions are fulfilled.
6.3.6
Carrying out wet cleaning of the turbine
Inadmissible thermal stress and flooding of the turbine
Smaller amounts of water can lead to an inadequate cleaning result. Larger
amounts of water lead to inadmissible thermal stress on the turbine compo-
CAUTION
nents and can cause flooding of the turbine.
It is imperative that turbine cleaning parameters are observed.
Maximum temperature at turbine inlet during cleaning
During cleaning, the temperature at the turbine inlet will rise and may strain
the material significantly.
CAUTION
Make sure the maximum temperature at the turbine inlet is not exceeded
during cleaning.
© Copyright 2017 ABB. All rights reserved.
before water in-
TE
has been reached
TE
HZTL4031_EN
Page 52 / 121
Conditions
20 ... 40 %
350 ... 430 °C
10 minutes
10 minutes
ensured
1.5 bar
5 ... 30 °C
Revision E
January 2017