Operation Check (1) - Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

6.3.2

Operation check (1)

Perform the following operation checks for screen No.3 created in section 6.2.
(1) Test
Perform the following tests in screen No. 3.
Item
1) Touch operation
Screen state
Screen No. 3 is not working properly.
Use the sequence program monitor (ladder) to diagnose the cause of the error.
Test object
Touch Run/Stop.
(Under normal conditions)
The Operating lamp turns ON, and the operating time starts
counting.
(Current operations)
The Operating lamp does not turn ON, and the operating time does
not start counting.
6.3 Sequence program monitor (Ladder)
Operation
6. About debug
1
2
3
4
5
6
6 - 11

Advertisement

Table of Contents
loading

Table of Contents