Test Operation - Mitsubishi Electric GOT DRIVE GOT2000 Manual

Graphic operation terminal
Table of Contents

Advertisement

GOT Drive Control (Servo) Interactive Solutions
MR-J5
MR-J4
Key
Feature
02

Test operation

Check the equipment on the on-site GOT before going into full-scale operation
Without the need to set up a PC, you can confirm if the servo amplifier is working correctly before full-scale operation by
checking on the on-site GOT.
Sample screens
With the sample screens, you can perform test operations equivalent to those performed with MR Configurator2, such as JOG operation, positioning
operation, and output signal forced output.
JOG operation screen
4
Motor-less operation
* All of the above images are the connection sample screens of MR-J5-G.
No.
Function
1 JOG operation
2 Positioning operation
3 Motor-less operation
Output signal (DO)
28
4
forced output
5 Single-step feed
MR-JET
MR-JE
* Supported by MR-J4-B(-RJ), MR-J4W2-B, MR-J4W3-B, MR-JE-B only. See page 16 for details.
MR-J5-G(-RJ)
MR-J5D1-G4
MR-J5-B(-RJ)
MR-J5W2-G
MR-J5D2-G4
MR-J5W2-B
MR-J5W3-G
MR-J5D3-G4
MR-J5W3-B
Positioning operation screen
Output signal (DO) forced output screen
MR-J4-B(-RJ)
MR-J4-
MR-J4-
MR-J4W2-B
A
A-RJ
MR-J4W3-B
SoftGOT
GT27
GT25
GT21
(Single-ch)*
Sample
End user
OEM
screen
: Supported —: Not supported
MR-J4-
MR-JET-
MR-JE-
MR-JE-
GF(-RJ)
G
B
A
SoftGOT
(Multi-ch)
Easy
startup
MR-JE-
C

Advertisement

Table of Contents
loading

Table of Contents