Communication Settings - Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

4.2.2

Communication settings

P
O
I
N T
P
O
I
N
Settings described in this section are not required when settings are made on the new project wizard (Section
4.2.1).
The GOT and PLC CPU communication settings are performed.
When using the GOT for the first time, set the channel number and communication driver for the communication
interface, and write the settings to the GOT.
This section explains how to connect the GOT to the Ethernet port built in a Q(nUDV)CPU via Ethernet.
4 - 8
4. From GOT screen creation up to the test
4.2 Screen creation
(Next page)
1.
Double-click [CH1] in the [Controller Setting]
menu in the system tree.
1.
2.
The [Controller Setting] dialog appears.