6.3.5

Operation check (2)

Display the screen for writing a project, and then write data to the GOT.
Reset the PLC CPU using the RESET key switch, and then switch to RUN.
(1) Test
Perform the following tests in screen No. 3.
Item
1) Touch operation
2) Touch operation
Check the Operating lamp turns ON, and that the operating time counts up.
6 - 18
6. About debug
6.3 Sequence program monitor (Ladder)
Test object
Screen state
Screen state
Turn on X2, and touch Run/Stop.
The Operating lamp turns ON, and the operating time starts counting.
Touch Running/Stop.
The Operating lamp turns OFF, and the operating time stops.
Operation