System Installation; Unpacking Instructions; Choosing Location; Mounting The B30 - GE B30 Technical Reference Manual

Patient monitor
Hide thumbs Also See for B30:
Table of Contents

Advertisement

B30 Patient Monitor
1

System installation

1.1 Unpacking instructions

1.
Confirm that the packing box is undamaged. If the box is damaged, contact the shipper.
2.
Open the top of the box and carefully unpack all components.
3.
Confirm that all components are undamaged. If any of the components is damaged,
contact the shipper.
4.
Confirm that all components are included. If any of the components is missing, contact
your GE Healthcare distributor.

1.2 Choosing location

Consider the following aspects:
lighting
space
connections
electromagnetic and radio frequency interference. For details see Appendix
ElectroMagnetic Compatibility
environment
WARNING
The monitor or its components should not be used adjacent to or stacked
with other equipment. If adjacent or stacked use is necessary, the monitor
and its components should be observed to verify normal operation in the
configuration in which it will be used.
CAUTION
The monitor display is fragile. Ensure that it is not placed near a heat source or
exposed to mechanical shocks, pressure, moisture or direct sunlight.

1.3 Mounting the B30

Mounting of B30 to the Wall Mount, Rollstand, Wall Mount with standard arm or Counter Top
Mount is described in a separate instruction sheet delivered with each mount.
WARNING
After transferring or reinstalling the monitor, always check that it is
properly connected and all parts are securely attached. Pay special
attention to this in case of stacked mounting.
WARNING
The monitor must not be used without a manufacturer approved mounting
attached.
WARNING
Never install the monitor so that it is above the patient.
2-1
.
Document no
2044677-001
B.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents