2.4 Project Plan and Coordination

2.4.1 Project Plan

Before the project kick-off, the project supervisor should keep contact with the
representative of the user, develop the project plan according to the actual conditions
and preparations and inform the user of the plan, which includes the following items:
I. Division of responsibilities
1)
The user should complete infrastructure construction related to the equipment
room.
2)
The user should coordinate to complete the installation of auxiliary equipment.
3)
Engineers of the vendor are responsible for the installation of the equipment
provided by the vendor.
4)
The project responsibilities are determined through negotiation of both sides on
the basis of contract and project documents.
II. Project coordination
1)
Personnel
As the project responsible person, the project supervisor should provide the user with
the names and contact means of the project principal and the principal of each project
subdivision. It is recommended that the user should provide a name list of the
concerned technical support engineers and contact means to the vendor.
2)
Tools
Inform the user to prepare tools that are not convenient to be carried or not available
for the time being, and then confirm the preparation.
III. Project schedule
Make a schedule for the project proceeding in line with the preparations, and present
it to the user for confirmation. The schedule should include the following items:
1)
Delivery date and expected arrival date
2)
Date on which engineers arrive at the venue of the user
3)
Schedule for the installation and commissioning.

2.4.2 Project Coordination Meeting

After arriving at the site, the project supervisor should organize a project coordination
meeting with the user, create a project plan and implementation program, and
designate the related persons in charge.
2-5 
Hardware Installation
2 Installation Preparations