Section 11
Testing functionality by secondary injection
IEC07000106 V2 EN-US
Figure 27:
where:
1
2
3.
Decrease slowly the voltage in phase UL1 of the test set until the START signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set undervoltage
blocking U1Low.
5.
Repeat steps
Check of U2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 28.
124
UL1
UL2
UL3
UN
Connection of the test set to the IED for test of U1 block level
is three-phase voltage group1 (U1)
is three-phase voltage group2 (U2)
2
to
4
to check U1Low for the other phases.
The connections to U1 must be shifted to test another phase. (UL1 to UL2,
UL2 to UL3, UL3 to UL1)
© 2017 - 2021 Hitachi Power Grids. All rights reserved
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000106-1-en.vsd
1MRK 511 403-UEN Rev. K
SEMOD175258-91 v3
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents