6.
Check that for a forward fault, carrier send (CS) signal is first obtained from the delta based
fault inception detection (as it is not directional) , and immediately inhibited by the forward
zone.
7.
Activate the IED receive (CR) signal.
8.
Apply a fault condition in the forward directed zone used for scheme communication tripping.
9.
Check that the no trip from scheme communication occurs.
10.
Check that the trip time from the forward directed zone used for scheme communication
tripping complies with the zone timer and that correct trip outputs, external signals, and
indications are obtained for the actual type of fault generated.
11.11.1.6
Checking of unblocking logic
Check the unblocking function (if the function is required) when checking the communication
scheme.
Command function with continuous unblocking (Unblock = 1)
Procedure
1.
Activate the guard input signal (CRG) of the IED.
2.
Using the scheme selected, check that a signal accelerated trip (TRIP) is obtained when the
guard signal is deactivated.
11.11.1.7
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
11.11.2
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH
Prepare the IED for verification of settings as outlined in section
section
Values of the logical signals for ZCRWPSCH are available on the local HMI under Main menu/Tests/
Function status / Scheme communication / ZCRWPSCH(85) /ZCRWPSCH:1.
The Signal Monitoring in PCM600 shows signals that are available on the Local HMI.
The current reversal logic and the weak-end infeed functions are tested during the secondary-
injection test of the impedance or overcurrent protection zones together with the scheme
communication logic for the distance protection function ZCPSCH.
11.11.2.1
Function revision history
Document
revision
B
C
D
E
F
G
Table continues on next page
Bay control REC670
Commissioning manual
"Preparing for test"
in this chapter.
Product
History
revision
2.2.1
-
2.2.2
-
2.2.2
2.2.2
-
2.2.3
-
2.2.3
-
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
"Requirements"
and
GUID-23BE6A6F-8D87-4CD9-952B-40EE65D7F04C v1
Section 11
M13868-72 v4
M13868-76 v6
M13868-84 v6
M14947-2 v7
179

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents