Section 3 - Set-Up & Operation; Machine Placement; Electrical Precautions; Grounding Instructions - Sharp MAX-PRO 1182 Operator's Manual

Table of Contents

Advertisement

ELECTRICAL PRECAUTIONS

Ensure no liquids are near the machine to eliminate
the possibility of spilling onto any electrical compo-
nents and creating a short circuit.
Should a liquid spill onto the machine, turn off the
power immediately, unplug the power cable and once
having cleaned the liquid, have a qualified technician
inspect and test all the electrical components to en-
sure they are functioning properly. To avoid short-
circuiting, keep all wires and connections clean and
keep your body, hand-held tools and any other electri-
cally conductive objects away from any exposed elec-
trical components.
Ensure the electrical cabinet is always closed, unless
needed for maintenance. Always ensure that the
ground wire is firmly connected with the ground before
starting the machine. Use double grounding for added
protections. After installation, check electrical connec-
tions before starting the machine.

GROUNDING INSTRUCTIONS

Improper connection of the equipment grounding con-
ductor can result in a risk of electrical shock. Check
with a qualified electrician or service person if you are
in doubt as to whether your machine outlets are
properly grounded.
This machine must be grounded. In the event of mal-
function or breakdown, grounding will reduce the risk
of electrical shock by providing a path of least re-
sistance for electrical current. This machine is
equipped with a cord having an equipment-grounding
conductor for a 3 prong grounding plug. The plug must
be connected into an outlet that is properly installed
MAX-PRO Operator Manual
SECTION 3 - SET-UP & OPERATION

MACHINE PLACEMENT

and grounded in the accordance with all local codes
and ordinances. Do not modify the plug provided with
the machine.
If your electrical supply does not meet the above
specifications, or if you are unsure your building has
an effective ground, have a qualified electrician or
your local electrical utility company check the ground
and correct any problems.

STORAGE

If the machine will not be used for a considerable
amount of time, it should be stored in the original ship-
ping crate, in a temperature controlled environment to
protect it from damage.
MACHINE PLACEMENT
Your Sharp Bagger has been shipped to you well crat-
ed in order to prevent any damage to the machine. It
is important that you follow the Uncrating Instructions
attached to crate.
After being uncrated, place the Sharp MAX-PRO bag-
ger in well ventilated area, on a rigid and vibration free
surface. Before continuing with the installation of the
machine, ensure all nuts, bolts and screws are tight-
ened as they can come loose during shipping.
The Sharp MAX-PRO should be placed in a dedicated
space for operation on a smooth level surface with
access to 100 PSI of clean, dry compressed air, and
115 VAC, 50/60 Hz, 20 Amp properly grounded elec-
trical outlet.
Locate the machine so there is adequate access to
the side for loading bag film.
Make sure unit is located at a comfortable height for
operation and product loading. See
ment
The unit is equipped with two swivel locking casters
for easy maneuverability. Lock the casters after plac-
ing machine in desired location.
3-1
(page 3-3).
Original Printed in English
Height Adjust-

Advertisement

Table of Contents
loading

Table of Contents