Hydrokit J or H generation
6.4.2 Outdoor units and mono-bloc units
Carry out the following steps to install the outdoor unit or mono-bloc unit:
1. Exercise caution when unpacking the device at the installation site.
2. Attach the device to a concrete foundation or a strong ground frame by means of four anchor
bolts as shown in the illustration (see below) e.g. on the outer wall of a building. Ensure
horizontal alignment of the device. Also observe the instructions in the sections on attaching
the devices (→
unit, p.
Aquarea air-to-water heat pumps - Planning and installation manual - 02/2022
1
2
3
1
> 375
> 375
5
5
7
0
1
6
0
200
5
4
7
6
5
5.2.2.3 Securing the outdoor unit, p.
111).
1 Wall
2 Top mounting plate
3 Hexagon screw M8 with washer
4 Hydrokit
5 Bottom mounting plate
6 Hooks
7 Slots
8 Phillips head screw
1
2
102, →
5.2.3.3 Securing the mono-bloc
Installation
6
5
8
153