Table 32 Tightening Torque (61009) - ABB HT564586 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A100-L
8
Disassembly and assembly
Fitting the gas inlet casing
Figure 45: Fitting the gas outlet casing (A175-L and smaller)
Part number
61009
Table 32: Tightening torque (61009)
1) Pre-tightening torque of the screws
1. Fit two guide studs (90317) in the upper area on the gas outlet casing (61001).
2. Loop around the gas inlet casing (51001) with the lifting gear and secure it to the crane.
3. Push gas inlet casing over the guide studs up to the gas outlet casing.
4. Screw in two opposite screws (61009) with high-temperature grease.
5. Remove the guide studs (90317) and fit the remaining screws (61009) with high-
temperature grease.
6. Fit the screws (61009) by tightening them crosswise, first to the pre-tightening torque, then
to the tightening torque.
7. Remove the lifting gear.
8. Connect the flange of the gas inlet casing and the bellows.
© Copyright 2016 ABB. All rights reserved.
A165-L
M16
30
Nm
1)
160 Nm
HZTL4034_EN
A170-L
M18
40
Nm
1)
220 Nm
Revision F
Page 78 / 111
A175-L
M22
50
Nm
1)
410 Nm
June 2016

Advertisement

Table of Contents
loading

Table of Contents