Table of Contents

Advertisement

Operation Manual / 4 Product description / A100-L
5
Operation and service
Suggestion for noise insulation, bellows
Figure 11: Noise insulation, bellows
01
Compressor casing
02
Bellows
03
Charge air duct / scavenging air duct
04
Insulation cushion
05
Insulation mat (at least 15 mm)
06
Sheet metal cover
5.2

Service work

Service work includes visual inspections, monitoring, measuring and inspection work as well
as function checks. Service work enables to detect and rectify changes to the turbocharger
and ensures full operability of the turbocharger.
Service intervals
Service work on the turbocharger that are omitted or performed too late can
cause excessive contamination, wear and operating failures.
CAUTION
Carry out the service work at the specified time intervals.
© Copyright 2016 ABB. All rights reserved.
HZTL4034_EN
Page 30 / 111
Revision F
June 2016

Advertisement

Table of Contents
loading

Table of Contents