Final Work Steps - Siemens SIREMOBIL Iso-C Maintenance Instruction

Table of Contents

Advertisement

Final Result / Quality Inspection and General Maintenance
5.1

Final Work Steps

SIE
Protective conductor test
SIE
Protective conductor resistance
Perform the protective conductor test with the system closed according to
ARTD-002.731.17. Document and evaluate the determined values. The protective
conductor resistance must not exceed 0.2 Ohms.
NOTE
SIE
Leakage current
Measure the leakage current according to ARTD-002.731.17. Document and evaluate
the determined values. The limit value of 2.5 mA may not be exceeded.
NOTE
Siemens AG
Medical Solutions
Evaluate the results by comparing the first measured value to the
corresponding values documented during preceding maintenance
procedures or safety checks.
A sudden or unexpected increase in the measured values may in-
dicate a defect in the ground wire connections (ground wire or
contacts) - even if the limit value of 0.2 Ohms is not exceeded.
Evaluate the results by comparing the first measured value to the
corresponding values documented during preceding maintenance
procedures or safety checks.
A sudden or unexpected increase of the measured values may in-
dicate that a fault has occurred in the primary circuit of the power
supply (damaged insulation, damage caused by water ingress or
humidity, defective interference suppressor, etc.) - even if the limit
value of 2.5 mA is not exceeded.
SPR2-230.101.02.06.02
07.05
Page 45 of 46
CS PS 24
SIREMOBIL Iso-C

Advertisement

Table of Contents
loading

Table of Contents