Reconstruction - Siemens SIREMOBIL Iso-C Maintenance Instruction

Table of Contents

Advertisement

Safety Inspection
3.4
3D reconstruction
SIE
3D reconstruction
NOTE
Check the belt tension of the toothed belt for motor-controlled orbital movement.
Press the Emergency Stop switch and perform a 3D scan. The motor-controlled orbital
movement must not start up.
Deactivate (disengage) the Emergency Stop switch.
X
Start a further 3D scan. The 3D scan must be executed properly. The motor-controlled
orbital movement must stop at the end position of the C-arm.
Calibrate the 3D reconstruction. See section "IQ quick test".
Check the 3D limiting resolution. See "IQ quick test".
If the system is equipped with a navigation system, the required calibration of the 3D re-
construction has to be performed together with a navigation system engineer. Before
starting the calibration, make sure that the I.I. cap of the navigation system is in place.
See "IQ quick test".
SIE
3D reconstruction with navigation system
NOTE
X
Check the overall accuracy of the navigation system together with an engineer of the
navigation system manufacturer. See "IQ quick test".
Siemens AG
Medical Solutions
The calibration of the 3D reconstruction is part of the safety in-
spection. It can, however, also be performed together with the IQ
quick test.
See
(Final
Maintenance / p.
Checking the overall accuracy of the navigation system in combi-
nation with the 3D reconstruction is part of the safety inspection.
It can, however, also be performed together with the IQ quick test.
See
(Final
Maintenance / p.
SPR2-230.101.02.06.02
07.05
Result
/
Quality
44), IQ quick test.
Result
/
Quality
44), IQ quick test.
Page 35 of 46
CS PS 24
Inspection
and
Inspection
and
SIREMOBIL Iso-C
35
General
General

Advertisement

Table of Contents
loading

Table of Contents