Measurements - Siemens SIREMOBIL Iso-C Maintenance Instruction

Table of Contents

Advertisement

Safety Inspection
3.6

Measurements

SIE
Protective conductor test (performed under "Final Work Steps")
Test the protective conductor with the protective conductor wire tester according to
ARTD-002.731.17... .
The protective conductor resistance must not exceed 0.2 Ohms.
NOTE
SIE
Leakage current test (performed under "Final Work Steps")
Perform the leakage current test with the system closed according to
ARTD-002.731.17. Document and evaluate the determined values. Document the
measuring procedure. The leakage current must not exceed 2.5 mA.
NOTE
Siemens AG
Medical Solutions
The protective conductor test is part of the safety inspection. How-
ever, it cannot be performed until all maintenance work has been
completed. See
The leakage current test is part of the safety inspection. However,
it is recommended to perform it only at the end of maintenance,
with the system closed. See
SPR2-230.101.02.06.02
07.05
(Final Work Steps / p.
(Final Work Steps / p.
Page 37 of 46
CS PS 24
45).
45).