HT and single tank error diagnosis
Tests and measurements in the high voltage circuit
•
Connect the oscilloscope measurement cables to measuring points HTPOS and HTNEG
or HT on D1.
•
Adjust the trigger point to the falling edge of the high voltage curve and set the time to
20 - 50 ms/Div.
•
If the high voltage cannot be displayed, check the tube current at measurement point
MAPOS on D1. Check the inverter current with an external current transformer.
•
Measure HTPOS and HTNEG on D1. Record the fall times (90 - 10% of HT), high
voltage levels and whether the exposure was interrupted prematurely. Compare with
fig. 2 "HT signal, inverter and single tank normal".
•
Measure the inverter current using an external current transformer and the HT. Compare
with fig. 1"HTPEAK and inverter current, inverter and single tank normal".
•
In case of an error, compare the oscillogram with Fig. 1 "HTPEAK and inverter current,
inverter and single tank normal"