Huawei LUNA2000-100KTL-M1 User Manual page 106

Smart power control system
Hide thumbs Also See for LUNA2000-100KTL-M1:
Table of Contents

Advertisement

LUNA2000-100KTL-M1 Smart Power Control System
User Manual
Figure A-1 Requirements for OT/DT terminals
Crimping an OT or DT Terminal
● Avoid scratching the core wire when stripping a cable.
● The cavity formed after the conductor crimp strip of the OT or DT terminal has
● Wrap the wire crimping area with heat-shrink tubing or insulation tape. Heat-
● Take care when using a heat gun to avoid heat damage to the equipment.
Issue 02 (2023-01-10)
NO TICE
been crimped must completely wrap around the core wires. In addition, the
core wires must be in close contact with the OT or DT terminal.
shrink tubing is used in this section as an example.
Copyright © Huawei Technologies Co., Ltd.
A Crimping an OT or DT Terminal
100

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents