QWIK-PURE
®
9.2 Maintenance schedule
Maintenance
Turbidity test of wastewater and documenting the
result
Changing the filter cartridges
Clean assembly units
Visual inspection
Leakage test
9.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the respective
preparatory tasks must have been completed.
40 | 64
Installation and operation manual
Interval
•
Weekly
•
Mandatory in case of a negative result of the
turbidity test
•
If the level indicator's red marking is visible
•
At least annually
•
As part of troubleshooting
•
Weekly
•
Recommendation: After all assembly and
maintenance work on the product