Maintenance Schedule; Maintenance Work - Beko QWIK-PURE 10 Installation And Operation Manual

Table of Contents

Advertisement

QWIK-PURE
®

9.2 Maintenance schedule

Maintenance
Turbidity test of wastewater and documenting the
result
Changing the filter cartridges
Clean assembly units
Visual inspection
Leakage test

9.3 Maintenance work

For maintenance work to be carried out, the following prerequisites must be fulfilled and the respective 
preparatory tasks must have been completed.
40 | 64
Installation and operation manual
Interval
Weekly
Mandatory in case of a negative result of the
turbidity test
If the level indicator's red marking is visible
At least annually
As part of troubleshooting
Weekly
Recommendation: After all assembly and
maintenance work on the product