6.2 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks
must have been completed.
Tools
•
Adjustable spanner
•
Water pump pliers
•
Spirit level
1.
Select and set up the place of installation according to the specifications in section "4.6
Assembly conditions" on page 22.
2.
The condensate inlet line provided by the customer must be depressurised and locked and
tagged out to prevent unintentional pressurisation.
3.
Have the necessary tools and materials ready.
4.
Prepare the required connection materials suitable for the pressure and temperature range.
5.
Check the product for damage. Only use the product in an undamaged state.
Illustration
26 | 64
Prerequisites
Material
•
Sealing material (e.g. PTFE tape)
for sealing the condensate
connections provided by the
customer
•
Hose clamps
•
Hose for condensate
Preparatory tasks
Assembly work
Description / explanation
1. Position the collector on a flat surface.
2. Align the foot with the positioning tubes facing
downwards and position it over the assembly
opening.
3. Tilt the upper end of the foot towards the filter
cartridge holder until the positioning tubes are
vertical.
Installation and operation manual
Protective equipment
Always to be worn: