Assembly Work - Beko BEKOMAT 16i CO Translation Of Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual
Wrong

6.3 Assembly work

For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have 
been completed.
Tools
Spanner or adjustable end wrench
Depressurise the pressurised system or the respective system section and secure it against unintentional
1.
pressurisation.
2.
Get the hose and hose clamp ready for connection to the condensate discharge.
Right
Prerequisites
Material
Sealants e.g. PTFE
Feed line
Drain line
Hose, interior diameter
8 ... 10 mm (0.31 ... 0.39 in),
length approx. 30 cm (1 ft)
Hose clamp
Preparatory tasks
Description / explanation
Ensure venting
If the slope in the inflow is not sufficient or 
there are other problems with the inflow, 
install a venting line.
Discharge from pressurised pipes
Divert the flow of gas to provide a deflecting 
surface to discharge the fluid components in 
the gas.
Protective equipment
Always to be worn:
BEKOMAT
16i CO
®
33 | 76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm16ico

Table of Contents