Commissioning Work - Beko BEKOMAT 16i CO Translation Of Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

8.2 Commissioning work

Illustration
X2
X3
X5
X4
X5
X2
X3
X4
Description / explanation
1. Connect the voltage supply.
0 The BEKOMAT
carries out the power-on self-test.
®
2. Slowly pressurise the system (e.g. by slowly opening
the recommended shut-off valve [X4] in the
condensate inlet line [X5]).
0 Slowly open the shut-off valve [X3] in the venting
line.
3. Carry out a functional test (see "10.3.2 Functional test"
on Page 54).
BEKOMAT
16i CO
®
43 | 76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm16ico

Table of Contents